How to plan the steps for a card

How to plan the steps for a card

Summary

The Steps tab in a card is used to plan labor time, equipment time, equipment used and steps will be made when passing the card through the value stream.

 Plan the Steps

  1. Go to Planning -> Projects.

  2. Select a project, click on Cards at the top of the project, select a card, then click on the Steps tab. 

  3. Here are the fields to fill in the Steps tab:

    1. Determines whether the step is to be done.

    2. When checked, the step's planned time will not be multiplied by the card's batch size.

    3. Determines whether the card will be exploded after the step. The batch size will equal the number of cards created. So if a card has a lot size of 5, it will be exploded into 5 cards with a lot size of 1.

    4. Shows the value stream and step title.

    5. Enter the planned labor time.

    6. Shows the total lot size multiplied by the planned labor time.

    7. Enter the planned equipment time.

    8. Displays the total lot size multiplied by the planned equipment time.

    9. Upload an instruction file or technical drawing (optional).

    10. Choose a Workstation (optional). The workstation determines which equipment will be used. If the field is not filled in, any equipment can be used.

    11. Insert a checklist. To create the list, click on the +, then insert a title and description. The list will need to be checked off before progressing to the next step. You can also add a photo. When the list conforms, the button turns green.


    • Related Articles

    • How to consume inventory in a card

      Summary Inventory consumption in a card allows you to deduce quantities from your inventory and know its destination. Unplanned consumption Open the desired card, then go to Consumption. Scan the inventory to be consumed. The inventory will appear in ...
    • Release August 5th, 2021 (v.9.11.8)

      August 5, 2021  Context This release comes with minor ALIX fixes. News and Corrections     ✯ Fixed a bug in the Operation board that could break card flow when deleting steps in the configuration.    ✯ Added few save confirmation popup.    ✯ Added a ...
    • Work time - manual vs. automatique

      Summary There is two ways to enter work time per card in ALIX : manual or automtique. With either choice you can still manually add time in a card when the card is in operations table. This article explains the two choices and what configurations ...
    • Release February 26th, 2024 (v.11.1.9)

      Context This update brings minor improvements and fixes. Release date: February 26, 2024. Receive the latest news from ALIX by subscribing to the newsletter News None Minor Improvements Add the ability to have a drop-down option in the creation of ...
    • Release September 20th, 2021 (v.9.11.18)

      September 20, 2021  Context This release brings minor improvements and bug fixes. News ✯ Improvement on consumption with scan in cards The consumption behavior when scanning in a card has been improved. From now on, if the planned quantity to consume ...