How to Use the Production Release Panel of the Operation Board

How to Use the Production Release Panel of the Operation Board

Summary

This article explains how to use the Production Release Panel in the Operation Boards.

Depending on your different roles and permissions, this functionality may not be visible.

 How to send cards to production

  1. In the Operations tab, display the Production Release Panel, by clicking on the Production Release vertical bar.



  2. Enter your criteria for displaying projects to be put into production, then click on the Filter icon. The corresponding projects will appear in the Projects column.

    It is necessary to click on the filter icon to see projects appear. If you want to see all the projects, click on the Filter icon without having fulfilled any criteria.


  3. Check Select under the filter to select all projects or select the desired projects manually by clicking on the check box at the top right of each card.



  4. By selecting one or more cards, the Available Inventory section will appear at the bottom of the column. This indicator shows if the available inventory stock level is sufficient to produce the selected cards. It is based on the current available measure and the required quantity for the selected cards and the cards already in production. If inventory is available, a thumbs up will be displayed. Otherwise, it will be a thumbs down.



  5. When you are ready to send the cards to production, click on Send.


    • Related Articles

    • How to Use the Operation Board

      Summary The Operations Board is the ideal tool for monitoring operations. It allows you to see the cards in production, the cards on hold and the equipment occupied at a glance. Depending on your different roles and permissions, some elements ...
    • Release August 5th, 2021 (v.9.11.8)

      August 5, 2021  Context This release comes with minor ALIX fixes. News and Corrections     ✯ Fixed a bug in the Operation board that could break card flow when deleting steps in the configuration.    ✯ Added few save confirmation popup.    ✯ Added a ...
    • Release May 1st, 2024 (v.11.2.8)

      Context This update brings minor improvements and fixes. Release date: May 1, 2024. Receive the latest news from ALIX by subscribing to the newsletter News Minor improvements Added an option in the operation board to choose between the default ...
    • Release May 6th, 2022 (v.9.18.6)

      May 6, 2022  Context This update brings some minor improvements and fixes. News ✯ Improved performance in the operations board A major optimization of the performance of the "Projects" section in the operations board has been carried out. This will ...
    • Release Octobre 21st, 2021 (v.9.11.29)

      October 21, 2021  Context This release brings minor improvements and bug fixes. News ✯ The inventories to produce (standby) can now be reserved When using the réservation tool in Project/Sales, it is now possible to select an inventory to produce. ✯ ...