✯ Dynamic change of planned consumption mode
- A new configuration now allows to directly and dynamically change the consumption mode from standard to phantom in the full cards and vice versa. This is very convenient if in general one of the cases occurs, but occasionally the other is possible.

Here are two examples to fully grasp the usefulness of this configuration: - To produce, Marc must consume an item that is a bag of parts that are usually produced in advance. However, this time, there is no more left in the warehouse. Marc therefore converts consumption into a phantom and directly manufactures the bag of parts he needs by fetching the required sub-components.
- To produce, Marc always manufactures the sub-assemblies in phantom mode. However another order has been cancelled today and a sub-assembly is already produced and in stock in the warehouse. Marc therefore converts his phantom consumption into standard consumption and will scan the already produced sub-assembly in warehouse to consume it.
- This configuration is disabled by default and can be enabled in the project section of ALIX configurations:

✯ Other minor improvement(s)